Cairns Field

New Era Electric was contracted to completed the electrical scope of work for fueling repairs located at Cairns Field, at Ft Rucker, AL.

This scope of work included Installation of new Class 1 div 1 lighting at the Pump house canopy, Upgrading raceway and devices under canopy to meet Class 1 div1 requirements to include receptacles and fire alarm manual pull stations.
We provided and installed new Power center in concert with motor controllers for operation of new above ground Product recovery tank. This included raceways and wiring for power and controls circuits for proper operations.
All grounding was also provided and installed according to design specifications to ensure continuity. Additional EFSO locations were installed to meet current standards as well as Ground Verification units at truck offloads for Fueling safety. We were able to complete these repairs on time and Budget. 

Louis Armstrong New Orleans International Airport
New Orleans, Louisiana


New Era Electric was contracted by Talon Industries to complete the Electrical installation for a New Hydrant Cart Test stand for New Orleans fuel Facility located a the New Orleans International Airport Louisiana.
We were able to provide all aspects of this electrical installation to include, New electrical service, new underground electrical duct bank, Power and control race way and wiring for a complete functional system, Site lighting for night operations, and communications tie in to existing system for monitoring.
We were also able to partner with local contractors to provide Logistics and support for engineering services like Rack manufacturing and fiber optic cable installation.
New Era Electric was able to meet Time and Cost schedule as outlined to ensure this was a successful project.

Fort Campbell, Kentucky

New Era Electric was contracted By Reliable Contracting Group to complete the electrical repairs at Fort Campbell Kentucky on their bulk storage tanks, Oasis and Sabre. While completing these repairs we were requested to complete additional repairs to their Main Bulk Storage tanks. These repairs consisted of removing raceways and wiring to allow for new tank coatings, re grounding tanks as required, Installation of new raceway and wiring for new level alarms, and installation of power to newly provided water draw off units.
The work was performed on schedule and budget.

MSY Main Rack
MSY Tank

Camp Crowder, MO

New Era Electric was contracted by Reliable Contracting Group to complete the Fueling Repairs at Camp Crowder located in Missouri.

This scope included Site lighting, Additional Emergency Fuel shut off locations routed back to a newly installed EFSO panel, relocation of fuel dispenser for additional work scope to be completed, relocation of FMU and installation of a new Generator transfer switch with plug to allow for Loss of power operations.

The work was completed on schedule and to satisfaction of the customer.

MSY Tank
Site Lighting
Generator Transfer Switch
Dispenser and FMU

Southwest Airlines Airport Baltimore Maryland

New Era Electric was contracted by Reliable Contracting Group LLC to complete the electrical Installation of Fuel facility system improvements at Baltimore/ Washington International Airport For Southwest Airlines. This scope was to install a new Hydrant Cart test stand.
New Era Electric coordinated and completed all Electrical aspects of this project to include, Providing New power and communications feed from the Operations building to new control rack locations. Installation of site lighting for night operations,installation of Control racks,Site Grounding For equipment and tank as required.
Raceway and wiring installation for power and controls for a complete and functioning system.
We were able to meet the schedule and design requirements for a successful completion for this Project for the Contractor as well as the Client.